Friday, 26 November 2010

Blog 13 - Shooting Schedule

As a group we have come up with some times and dates that will suit all of us. This way we can make sure we always have the time free on these dates following to film as a group:

JAN 4th
JAN 18th
FEB 1st
FEB 15th
MARCH 1st
MARCH 8th

We found some time around our other obligations, and it turns out we are all free from 9:00am to 11.30am. Depending on the weather, we will film within this time to get the footage we require for our music video.
The reason behind leaving a week in between each shoot is so we can log and transfer/capture our material on to Final Cut Express, where we will later be editing. The editing will be done in the four weeks we have after shooting, in and outside of lessons.

The equipment we require for the shooting is as follows:

-1 camera
-1 camera back including extra charged battery, a charger, a camera-computor lead and a spare tape
-1 tripod
-Bag full of clothes for costume changes during the shoot to represent a long journey.

The shoot locations will need a scan in terms of health and safety for the cast and crew. When filming in town, for example, when crossing the road while filming backwards, it is important we check there are no cars approaching, we will have someone appointed the job of 'guider' so they ensure there is nothing that will disrupt the person filming, this includes potholes too.

No comments:

Post a Comment